• Network

Data Centre is connected to the Internet with highly redundant network through multiple Gigabit backbones having multiple peering with other networks.

 

• Hardware Guarantee

Servers deployed at the Data Centre include a hardware replacement guarantee. In case of any hardware failure, the hardware is immediately replaced.

 

• Security

Data centre located inside its own secure compound, with 2.4 and 3 meter fencing and electric gate entry Equipped & monitored round the clock with closed circuits. Strict access controls are implemented including surveillance cameras, finger-print as well as Key card system in order to manage entries.

 

• Electrical Capacity

Equal Power distribution (60 watts per sq. ft.- 80 watts per sq. ft). Each cabinet 4' x 6' gets 110 volt, 20 amp circuit. The main power sums up to 480 volt, 3 phase. Power supplies are now also activated in Multiple DC.

 

• Power

In the unlikely event of a power outage from local power grid, all data centers' power systems are designed to run uninterrupted with the help of Two 2000KW auto-switched power generators and centralised UPS systems. Generators are regularly tested & can be used in emergency event of extended utility power outages.

 

• Precision Environment

Computerised Fully master-planned rise system / HVAC pipe system / Electrically monitoring. HVAC (Heating Ventilation Air Conditioning) systems are N+1 redundant, ensuring that a duplicate system can immediately come on-line in the event of an HVAC system failure.

 

• Fire Protection System

Wet Risers set in at every square position. FM-200 system is installed. The advanced fire protection system prevents fires from spreading in the unlikely event one should occur.

 

• Technical Specifications

  • Own 5mW on-site sub-station.

  • 2.5mW backup on-site sub-station.

  • Perkins generator connected via ATS systems.

  • 2 separate fibre duct points into the building.

  • N+1 PowerWave UPS system.

  • N+1 Airedale Air Handling system.

  • ~20c +/- 2c data floor temperature.

  • 16 Amp feed per equipment rack.

  • 24x7 secure entry via PAC-TAG system, with 4 layer entry.

  • 24x7 qualified engineers available for remote hands service.

  • 450mm heavy duty raised data flooring.

 
 
 
 